Pipeline hot taps, live tie-in's, crossings and service location

A range of tie-ins and hot taps have been completed by the core CC&E team.

Notable projects include:

  • HDPE Pipeliens
  • Hot tap to 42" mainline 24" to install branch. This was on a Class 900# pipeline. The HAZID and assurance reviews as well as field supervision and design were completed by Alan and involved stakeholders from across the world. The tie in was completed safely on time and on budget.
  • DN125mm to a DN450mm HPDE gas gathering networks, completed live and safely, ahead of schedule.
Over 100 live dig's, service locations and crossing have been completed managed by the core team at CC&E.

image